MCR
MCR University
Office of the Registrar
StudentPacific Gas and Electric Co. ReadmittedJuly 1, 2020 GradedNovember 2026
Syllabus: on July 2, 2020, a day after PG&E left bankruptcy, Greentech Media named four things it had to do to “survive and thrive.” Each course grades one.
Course · AssignmentGrade
SAF 101
Wildfire Safety
Don’t cause any more fires.
Caused the Zogg (2020), Dixie (2021) and Mosquito (2022) fires. No structures destroyed by its fires since.
C
REL 210
Keeping the Lights On
Replace almost all fire shutoffs.
Customers shut off: 653,000 in 2020, then 85,863 in a single shutoff in October 2026. Power back in about 4.6 hours, down from about 10 in 2020.
B
Continued →
Course · AssignmentGrade
AFF 300
Affordability
Don’t drive customers away.
Home rates up 69% from 2020 to 2025, 36% after inflation. 21% fewer customers buy its power. Five rate cuts since 2024.
D
CLN 245
Clean Energy
Keep pace with state goals.
Batteries: 423 MW contracted in 2020, 3.2 GW running now, 1.9 GW more coming. Power 71% carbon-free in 2025.
A−
Overall · GPA 2.43
Survived. Has not yet thrived.
C+
P.S. No grade for replacing Diablo Canyon by 2025. The state kept the plant open (SB 846, 2022).
Sources: Greentech Media, “4 Things PG&E Must Do to Survive and Thrive” (July 2, 2020); PG&E Form 10-K (2025); PG&E reports to the CPUC (2025–2026), incl. Oct. 14, 2026 shutoff report; EIA Form 861M; BLS CPI-U; CAL FIRE.